November 12th 2006: A busy November meeting with two layouts in operation. Thanks to Graham for bringing his line along.
A scatch built W&L loco "Sir Drefaldwyn".
A 3" scale Burrell, visiting us to have its 4 yearly S. Federation boiler examination and hydraulic test.
A scatch built LBLR O&K "Elf", with a prototypical train.
A Roundhouse Fowler being prepared for examination and 16mm Assn. boiler certification.